Phase 1 Restoration

The Humber Pig restoration follows two planned stages of work, Phase 1 and 2. Phase one takes the Pig from its original condition as found in the field to a fully roadworthy state. Phase 2 involves the higher level show standard restoration.


Seized Engine
Seized Engine

Released engine!
Released engine!

Carburettor in need of attention
Carburettor in need of attention

Solex 40 NNIP Carburettor Overhaul
Solex 40 NNIP Carburettor Overhaul

Replacement of tracta join rubber bellows
Replacement of tracta join rubber bellows

Installing new rubber bellows
Installing new rubber bellows

Corroded breather pipe
Corroded breather pipe

Fuel change over switch and fuel lines
Fuel change over switch and fuel lines

Brake lines, hoses and expander units
Brake lines, hoses and expander units

Removal of gearbox
Removal of gearbox

Gearbox removed
Gearbox removed

Inspection of flywheel
Inspection of flywheel

Hoisting gearbox onto bench
Hoisting gearbox onto bench

Gearbox Inspection
Gearbox Inspection

Pressure Plate
Pressure Plate

Release bearing
Release bearing

Friction plate
Friction plate

Relined Friction plate
Relined Friction plate

Gearbox service
Gearbox service

Custom Exhaust
Custom Exhaust

Final welding of exhaust
Final welding of exhaust

Distributor troubles
Distributor troubles

Manufacturing wings
Manufacturing wings

Rear wheel arch and light box fitment
Rear wheel arch and light box fitment

Wheel arch prep
Wheel arch prep

Chassis work
Chassis work

Wax-oiling chassis
Wax-oiling chassis

Interior work
Interior work

Interior Prep and painting
Interior Prep and painting

Painting Interior
Painting Interior

NextNext
 


Be the first to post a comment.